Rolls-Royce Archives
         « Prev  Box Series  Next »        

Provisional cost estimation for manufacturing a switchboard assembly design.


Identifier  ExFiles\Box 50\1\  Scan043
Date  1st April 1921
  
X4289

To EFC. {E. Fowler Clarke - Electrical Engineer} from Rd.

C. to Wor. {Arthur Wormald - General Works Manager}

Rd2/57A/M5. 4. 21.

X.4289. SWITCHBOARD TO ASSEMBLY DRG. D.1171. X3760.
EFC {E. Fowler Clarke - Electrical Engineer} 1/T14.3.21.

We have estimated the cost of manufacturing this design on a production basis, and the cost without profit comes out at £5. 6. 0 each.

This cost must be regarded meanwhile as provisional, as Wor {Arthur Wormald - General Works Manager} is looking into the details of the job, particularly the labour, and he advises us that he hopes to be able to effect certain economies.

We will issue a revised cost later on showing the effect of any alterations instituted by Wor. {Arthur Wormald - General Works Manager}

Handwritten:
Ammeter £1 " 15 " 0 !
Switchbox
without
ammeter £3 " 11 " 0 D {John DeLooze - Company Secretary} /Rd.
R^a
  
  
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).