Provisional cost estimation for manufacturing a switchboard assembly design.
| Identifier | ExFiles\Box 50\1\ Scan043 | |
| Date | 1st April 1921 | |
| X4289 To EFC. {E. Fowler Clarke - Electrical Engineer} from Rd. C. to Wor. {Arthur Wormald - General Works Manager} Rd2/57A/M5. 4. 21. X.4289. SWITCHBOARD TO ASSEMBLY DRG. D.1171. X3760. EFC {E. Fowler Clarke - Electrical Engineer} 1/T14.3.21. We have estimated the cost of manufacturing this design on a production basis, and the cost without profit comes out at £5. 6. 0 each. This cost must be regarded meanwhile as provisional, as Wor {Arthur Wormald - General Works Manager} is looking into the details of the job, particularly the labour, and he advises us that he hopes to be able to effect certain economies. We will issue a revised cost later on showing the effect of any alterations instituted by Wor. {Arthur Wormald - General Works Manager} Handwritten: Ammeter £1 " 15 " 0 ! Switchbox without ammeter £3 " 11 " 0 D {John DeLooze - Company Secretary} /Rd. R^a | ||
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).