Rolls-Royce Archives
         « Prev  Box Series  Next »        

Equipment estimate for a rig to check enrichment capsules on Merlin carburettors.


Identifier  ExFiles\Box 143\1\  scan0455
Date  11th July 1941
  
EQUIPMENT ESTIMATE.
To Mr Cartwrights.
C to N Chambers
C to Powers Dept.
C to Rm. {William Robotham - Chief Engineer}
Ref. EJJ/HC 2/H.11.7.41.
Req. signed by Mr. Robotham.
Estimated Cost
Labour. £ 30. 0. 0d.
Material. £ 35. 0. 0d.
Total. £ 65. 0. 0d.
Description of Work
Make and supply 1 - Rig for checking enrichment capsules on Merlin(Aero Engine) Carburetters to drawing J. {Mr Johnson W.M.} 22084.
Instructions for this job have been issued see memo Ref:- EJJ/DH. {D. Henderson - Showroom} 10/JA.1.7.41.
Requisition No. 1209
FOR DEPT.
R.R. M {Mr Moon / Mr Moore} /C No. C.9263.
WORKS ORDER No. / 181. 554.
EJJ/ES. H
  
  
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).


Copyright Sustain 2026, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙