Standardisation of headlamp and wing stay parts to resolve a 'jellying' issue on the front of the car.


Identifier  ExFiles\Box 172\1\  img173
Date  30th June 1930
  
RR 755 REVISED (10M) (DG 340 19-7-29) BM. 6/543
COMPLETED 27.9.30
ORIGINAL
STANDARDISATION of CHASSIS PARTS.
Date 30.6.30
Reference No. 457/
X No. 5390. 5800.
Drawing No.
Part List
Description of Parts. HEAD LAMPS CARRIED OFF THE FRAME AND STRONGER WING STAYS. WING STAYS TO F57225/6/7/8. LAMP BRACKETS TO D51917/8/9.
Origin. To improve the 'jellying on the front of the car.
Experimental Test Report. Fitted to 14-G4 and submitted to Sales. Approved by them.
Road Test Report. We have had failures of wing stays on every 25 HP. 10,000 miles test. The above scheme is a great advance. Bump and road tests proceeding.
[Stamp] 20/25 H.P. CHASSIS
[Checkboxes]
A Scrap and replace at all costs, including Chassis already delivered to Customers.
B Scrap and replace on Chassis in Works.
C Scrap present stock and replace on all Chassis not yet handed to test.
D Use existing stock Alteration effective on future Chassis.
Weight of Old Part. Cost of Old Part. £ 3. 17. 0d.
Weight of New Part. Cost of New Part. £ 4. 19. 11d.
Difference per Car. Difference per Car. £ 1. 2. 11d. Increase
Signature from Cost Dept. that above is correct. G {Mr Griffiths - Chief Accountant / Mr Gnapp} /Rb. {R. Bowen} 24.9.30. G. {Mr Griffiths - Chief Accountant / Mr Gnapp} 25.9.30. Wor. {Arthur Wormald - General Works Manager}
Cost of Parts in Works which will be scrapped if commenced on:-
Series.........£.........
Series.........£.........
Series.........£.........
INITIAL DATE REMARKS
EX. SG. {Arthur F. Sidgreaves - MD} 26.9.30 Agreed SG. {Arthur F. Sidgreaves - MD}
R. {Sir Henry Royce} 2/7/30 Agreed H {Arthur M. Hanbury - Head Complaints} /R.
WOR. {Arthur Wormald - General Works Manager} 30.6.30 Agreed Wor. {Arthur Wormald - General Works Manager}
RG. {Mr Rowledge} 1.7.30 Agreed Rg. {Mr Rowledge}
DA. {Bernard Day - Chassis Design} 2.7.30 Agreed Da. {Bernard Day - Chassis Design}
BY. {R.W. Bailey - Chief Engineer} 30.6.30 Agreed By. {R.W. Bailey - Chief Engineer}
EP. {G. Eric Platford - Chief Quality Engineer} 1.7.30 Agreed EP. {G. Eric Platford - Chief Quality Engineer} Subject to deliveries until 10,000 mile test O.K. EP. {G. Eric Platford - Chief Quality Engineer}
E. {Mr Elliott - Chief Engineer} 5.7.30 Agreed AE.
PN. {Mr Northey} 2.7.30 Agreed PN. {Mr Northey} I hope it may be possible for the vertical lamp brackets to be less in diam. for the smaller chassis than those
CWB. Agreed C. for inspection on the 20/25 in London. PN. {Mr Northey}
Hs. {Lord Ernest Hives - Chair} Agreed Hs. {Lord Ernest Hives - Chair}
  
  
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).


Copyright Sustain 2026, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙