Rolls-Royce Archives
         « Prev  Box Series  Next »        

Modifying drill jigs for a stiffener to achieve a specific gap for an approximate cost of £8.


Identifier  ExFiles\Box 87\1\  scan0275
Date  4th July 1938
  
-2-

Rm {William Robotham - Chief Engineer} /Std.1/MH. {M. Huckerby} 4.7.38.

It now transpires that the stiffener has been detailed for a .436 centre gap - the only alterations necessary on B.II to get the same gap are modified drill jigs for shutter top and bottom supports - the approx. cost of which Messrs.Marstons give as not more than £8.

In view of this and the desirability of the stiffener making metallic contact with the shutters for sweating purposes, we would like to know whether By. {R.W. Bailey - Chief Engineer} agrees to this extra tool expenditure - if so we will instruct Messrs. Marstons to proceed accordingly.

The new drill jig will be usable for B.III pieces and will be made without interrupting production supplies.

Rm {William Robotham - Chief Engineer} /Std.
  
  
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).


Copyright Sustain 2026, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙