The inability to reproduce the assembly method for American type rubber loaded connecting links from the Munro Factory.
| Identifier | ExFiles\Box 151\2\ scan0321 | |
| Date | 5th February 1937 | |
| To E. {Mr Elliott - Chief Engineer} from Rm {William Robotham - Chief Engineer} /Les. c. to Da. {Bernard Day - Chassis Design} c. to Ev. {Ivan Evernden - coachwork} Rm {William Robotham - Chief Engineer} /Les.4/AP.5.2.37 AMERICAN TYPE OF RUBBER LOADED CONNECTING LINKS. Re E {Mr Elliott - Chief Engineer} /Ev. {Ivan Evernden - coachwork} 4/MN.22.1.37. Up to the present, we are unable to discover how the Munro tube has been assembled. We had imagined that the ball pad was pressed into the tube as a last operation after the end had been spun over. However, we cannot reproduce the result. It is most unfortunate that E {Mr Elliott - Chief Engineer} /Psn. when at the Munro Factory in America did not discover their method of assembly. Rm {William Robotham - Chief Engineer} /Les. | ||
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
