Rolls-Royce Archives
         « Prev  Box Series  Next »        

Production of 22-gallon petrol tanks for the Bentley V chassis, and the lead time for press tools if they become a standard part.


Identifier  ExFiles\Box 100\2\  scan0140
Date  27th July 1939
  
451

To Rm. {William Robotham - Chief Engineer}
c. BY
c. Les. {Ivan A. Leslie}
c. RHC {R. H. Coverley - Production Engineer} /McC
c. BY {R.W. Bailey - Chief Engineer} /HEB {H. Biraben}

RHC {R. H. Coverley - Production Engineer} /Wld.2/AG.27.7.39.

BENTLEY V CHASSIS.

22 Gallon Petrol Tanks - F.CD.1442.

We are at present producing 12 of these tanks by hand as instructed, Should this tank become standard for production in quantities, 6 - 8 months will be required to obtain the necessary Press tools.

We should be pleased if Rm. {William Robotham - Chief Engineer} could give us some further information as to whether these tanks will become standard production.

RHC {R. H. Coverley - Production Engineer} /Wld.
  
  
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).


Copyright Sustain 2026, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙