Manufacturing operations and cost breakdown for a Bentley Pedal Gap Plate, part number FB.3204.


Identifier  ExFiles\Box 148\5\  scan0371
Date  12th July 1938
  
PEDAL GAP PLATE - Cont'd. {John DeLooze - Company Secretary}

BENTLEY

The Bentley Gap Plate, FB.3204 is of single piece construction, being at present sandcast at R.R.
The total foundry time is 144 minutes, and the material cost is 4/2d.

The operations are as follows :-

OP NO. | OPERATION | SETTING TIME | TIME ALL: | COST
1. | Drill five holes in flanges, 4 small holes & 4 holes in large flat face. | 15 m. {Mr Moon / Mr Moore} | 3 m. {Mr Moon / Mr Moore} | ½d
2. | Drill all inclined holes & countersink. | 15 m. {Mr Moon / Mr Moore} | 15 m. {Mr Moon / Mr Moore} | 1d
3. | Csk. holes in flanges & 2 holes in flat face. | | 2 m. {Mr Moon / Mr Moore} | ½d
4. | Tap. | | 1½ m. {Mr Moon / Mr Moore} | ¼d
5. | Mill angular face. | 30 m. {Mr Moon / Mr Moore} | 12 m. {Mr Moon / Mr Moore} | 2¼d
6. | Mill groove | 45 m. {Mr Moon / Mr Moore} | 15 m. {Mr Moon / Mr Moore} | 2¾d
7. | Mill boss face. | 30 m. {Mr Moon / Mr Moore} | 5½ m. {Mr Moon / Mr Moore} | 1d
8. | Remove burrs. | | 5 m. {Mr Moon / Mr Moore} | 1d

£. s. d. {John DeLooze - Company Secretary}
Material Cost.................. 0. 4. 2.
Direct Foundry Labour Cost... 0. 2. 3.
Direct Machine Labour Cost... 0. 0. 9¼d
Charges...................... 0. 6. 0½d. {John DeLooze - Company Secretary}
TOTAL FACTORY COST............0. 13. 2¾d
  
  
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).


Copyright Sustain 2026, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙