Delays in the system for print requisitions related to radiator matrices and proposing improvements.
| Identifier | ExFiles\Box 94\3\ scan0141 | |
| Date | 2nd February 1937 | |
| Handwritten notes: 340 STEADMAN horea Rn {Mr Robinson} /S M Typed content: To BY. {R.W. Bailey - Chief Engineer} From ROY {Mr H. Royce - Buyer} c.c. E {Mr Elliott - Chief Engineer} /Hts [Struck through] c.c. LY/CG [Struck through] c. O {Mr Oldham} /IB [Struck through] c.c. RHC {R. H. Coverley - Production Engineer} /Mr. Bowers [Struck through] c. Rm {William Robotham - Chief Engineer} /Std [Struck through] ROY {Mr H. Royce - Buyer} 3/HGL.2.37 P.III - RADIATOR MATRICES HY {Tom Haldenby - Plant Engineer} 11/G3.2.37 - We have investigated this matter - particularly the final paragraph of your Memo - and it is very evident we should put our system for dealing with such matters on a better basis, and so avoid similar delays in the future. In the present instance I note the original attached was issued by the D.O on the 16th ultimo and sent to HB {C. E. Harcombe} , being then passed by him to the C.O who, on receipt requisitioned a print on January 21st. The print itself reached the C.O. on January 26th, i.c. 5 days later, and was sent to Messrs. Marston on February 1st. It is suggested, should similar cases arise in future, that the D.O not only give us a note pointing out the urgency of the matter, but let us have the print at the same time. This should save valuable time. ROY. {Mr H. Royce - Buyer} [Signature] Att. Original note dated 18.1.37(to HY {Tom Haldenby - Plant Engineer} ) | ||
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
