Rolls-Royce Archives
         « Prev  Box Series  Next »        

Explaining a delay in designing the 40/50 HP. Bonnet Panel Stops due to design challenges and other urgent work.


Identifier  ExFiles\Box 25\1\  Scan158
Date  25th September 1933
  
LID {A. J. Lidsey} X1140

To Cx. {Major Len W. Cox - Advertising Manager} from E. {Mr Elliott - Chief Engineer}

c.c. for C. EN. HY. {Tom Haldenby - Plant Engineer} Ha. [Struck through]

re 40/50 HP. Bonnet Panel Stops.

Replying to your UX.12/RH. {R. Hollingworth} 22.9.33, the above job has unfortunately had to be shelved in favour of more urgent work.

As a matter of fact it is not so easy as may appear to design the necessary stiffness into it without making a heavy clumsy job, but we are looking into this now.

We shall, therefore, have to ask you to be patient for a little while longer while we get the job right for another trial.

E. {Mr Elliott - Chief Engineer}
  
  
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).


Copyright Sustain 2026, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙