Equipment estimate for an Air Flow Rig on No.2 Test Bed.
| Identifier | ExFiles\Box 143\1\ scan0360 | |
| Date | 29th March 1939 | |
| EQUIPMENT ESTIMATE. 1209 Requisition No. FOR DEPT. Ref. EJJ/HC 20/JA.29.3.39. R.R. M {Mr Moon / Mr Moore} /C No. B.5405. / 479. WORKS ORDER No. 816. C to Powers Dept. C to Rm {William Robotham - Chief Engineer} /Swdl. {Len H. Swindell} Req. signed by Mr.Robotham. Estimated Cost Labour. £ 4. 10. 0d. Material. £ 1. 10. 0d. Total. £ 6. 0. 0d. Description of Work Air Flow Rig - No.2 Test Bed. Instructions for this job have been issued see memo EJJ/DH {D. Henderson - Showroom} 1/JA.29.3.39. EJJ/HC. | ||
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
