Rolls-Royce Archives
         « Prev  Box Series  Next »        

Regular electrical testing of 10% of ignition coil cases to check insulation quality.


Identifier  ExFiles\Box 69\1\  scan0050
Date  28th April 1927
  
X4079 X8710

STU.
S.T./Mr.Brock.
BY {R.W. Bailey - Chief Engineer} /RM. {William Robotham - Chief Engineer}
EPO.

BY25/H. 28.4.27.

IGNITION COIL CASES.
*************************

Now that EPO. is in a position to try out electrically the insulation of the coil cases, I consider that it is most important we should put into practice his suggestion that 10% of the coil cases should be sent to EPO. regularly, in order to keep check on the quality of the material received.

We know that variation in the quality of the material or the filling may definitely affect the reliability of the coil case, hence the importance of keeping a careful eye on the insulating quality of the coil case material.

BY. {R.W. Bailey - Chief Engineer}
By
  
  
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).


Copyright Sustain 2026, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙