Progress meeting report from June 1919 detailing agreed corrections and changes to various components.
| Identifier | ExFiles\Box 18\6\ Scan022 | |
| Date | 30th June 1919 | |
| To By, from Bn. {W.O. Bentley / Mr Barrington} [crossed out] Mr. Swift [crossed out] Mr. Willis [crossed out] Mr. Hives [crossed out] Mr. Hargreaves [crossed out] C. to Bn. {W.O. Bentley / Mr Barrington} [crossed out] Hopps [crossed out] X 2565 X 2924 Bn {W.O. Bentley / Mr Barrington} 9/W30.6.19. PROGRESS MEETING. REPORT FOR 30TH JUNE, AT WHICH MR. SWIFT, MR. HIVES, MR. WILLIS, MR. HARGREAVES & BN. {W.O. Bentley / Mr Barrington} WERE PRESENT. K.17588. Filler Valve Seat. The Production Drawing Office request that a chamfer may be added at the top of the square to agree with pre-war practice. This was agreed. F.7063. Counter-sunk Head Screw used on 3-Way Relief Valve. The head of this screw is shown spherical and the Works wish it to be changed to Counter-sunk Head Screw with radius on the corner. This was agreed. U.1019. Pivot for Wiring Bracket. The position of the locating groove is wrongly dimensioned and the Production Drawing Office desires to correct this. This was agreed subject to parts already made being used up by chamfering the top edge which would project from the bracket, or else by by skimming off the necessary amount of metal. It will also be necessary on such parts to remove a similar amount of metal from the lower face of the boss of the wiring bracket. K.1910. R.4505. Screws for Distributor Case Trap. These screws were omitted from the Supervision Sheets, and the Production Drawing Office wish to correct this. This was agreed. Bn. {W.O. Bentley / Mr Barrington} [Signature] | ||
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).