Rolls-Royce Archives
         « Prev  Box Series  Next »        

From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Standardisation of chassis parts relating to increased rear shock damper loads.

Identifier  ExFiles\Box 16\4\  Scan174
Date  25th April 1930
  
RR 755 REVISED (10H) (DG 348 19-7-29) 5M. 6/643. COMPLETED 2.7.30.
STANDARDISATION of CHASSIS PARTS.
Date 25.4.30.
Description of Parts. INCREASED REAR SHOCK DAMPER LOADS
Origin. E/P R/T
To improve high speed road holding.
Experimental Test Report.
We find that in the case of cars habitually driven at high speeds, this loading forms a useful alternative to standard.
Road Test Report.
Run 5,000 miles on various experimental cars. Now running 10,000 miles on 23-EX. Loads 100 lbs. H.P. 100 lbs. L.P.
[STAMP: 20/25 H.P. CHASSIS]
Weight of Old Part.
Weight of New Part.
Difference per Car. £
Signature from Cost Dept. that above is correct. J Olham
[STAMP: RECEIVED 18 JUN 1930]
Cost of Old Part. Cost of modification when carried out during repair of cars at works + 'til Company's expense.
Cost of New Part. £0-19-9 per chassis
Difference per Car. £
X No. 7520
Drawing No.
Part List
A Scrap and replace at all costs, including Chassis already delivered to Customers.
B Scrap and replace on Chassis in Works.
C Scrap present stock and replace on all Chassis not yet handed to test.
D Use existing stock Alteration effective on future Chassis.
Cost of Parts in Works which will be scrapped if commenced on:-
Series.......£.......
Series.......£.......
Series.......£.......
INITIAL | DATE | REMARKS l. 7/6/30
XBJ. Sg.{Arthur F. Sidgreaves - MD} | 28-6-30 | Agreed Sg.{Arthur F. Sidgreaves - MD}
R.{Sir Henry Royce} | 27.5.30 | Agreed FHR.
WOR.{Arthur Wormald - General Works Manager} | 28.5.30 | Agreed, subject to 10,000 miles test. Wor.{Arthur Wormald - General Works Manager}
RG.{Mr Rowledge} | 29.4.30 | Agreed Rg.{Mr Rowledge}
DA.{Bernard Day - Chassis Design} | 2.5.30 | Agreed DA.{Bernard Day - Chassis Design}
BY.{R.W. Bailey - Chief Engineer} | 28.4.30 | Agreed BY.{R.W. Bailey - Chief Engineer}
EP.{G. Eric Platford - Chief Quality Engineer} | 28.4.30 | Agreed. - Have only increased HP. on cases I have done. EP.{G. Eric Platford - Chief Quality Engineer}
E.{Mr Elliott - Chief Engineer} | 16.5.30 | Agreed AE.
PN.{Mr Northey} | 28.4.30 | Agreed PN.{Mr Northey}
CWB. | 28.4.30 | Agreed C.
HS.{Lord Ernest Hives - Chair} | | Agreed.
  
  


Copyright Sustain 2025, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙