From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Standardisation of the electrical connection of the cutout shunt coil to the dynamo terminal.

Identifier  ExFiles\Box 172\3\  img116
Date  5th September 1928
  
RR 755 REVISED (10H) (DE 849 9-12-26) BM. 2/1187.
COMPLETED 9.5.29
STANDARDISATION of CHASSIS PARTS.
Date 5.9.28
No. 7740
Description of Parts. ELECTRICAL CONNECTION OF POSITIVE END OF CUTOUT SHUNT COIL TO DYNAMO TERMINAL C, INSTEAD OF B.
Origin. To avoid possibility of over-voltage on shunt Coil if main dynamo fuse is removed or fails.

Experimental Test Report.
We have established experimentally that this method of connection is also better than standard from the point of view of destruction of cutout contact points. Detailed reasons and observations are contained in our notes EFC4/T 16.5.28.

Road Test Report.
Run 8000 miles on 11G3.
" 7000 " " 8-EX.
" 12500 " " 14-EX.
No trouble, and cutout contact points all in good condition.

Drawing No.
Part List
A Scrap and replace at all costs including Chassis ready delivered to Customers.
B Scrap and replace on Chassis in Works.
C Scrap present stock and replace on all Chassis not yet handed to test.
D Use existing stock Alteration effective on future Chassis.

Weight of Old Part.
Cost of Old Part. £
Weight of New Part.
Cost of New Part. £ Wor{Arthur Wormald - General Works Manager}/EWT.
Difference per Car.
Difference per Car. £ Negligible.
Signature from Cost Dept. that above is correct. G/RB.{R. Bowen} 2.5.29 G.{Mr Griffiths - Chief Accountant / Mr Gnapp}
Cost of Parts in Works which will be scrapped if commenced on :-
Series.....£......
Series.....£......
Series.....£......

INITIAL | DATE | REMARKS
SG.{Arthur F. Sidgreaves - MD} | 9.5.29 | Agreed. Sg.{Arthur F. Sidgreaves - MD}
R.{Sir Henry Royce} | 11/9/28 | Agreed for R.{Sir Henry Royce}
WOR.{Arthur Wormald - General Works Manager} | 8.9.28 | Agreed. Wor.{Arthur Wormald - General Works Manager}
RG.{Mr Rowledge} | 7.9.28 | Agreed. RG.{Mr Rowledge}
DA.{Bernard Day - Chassis Design} | 6.9.28 | Agreed. Da.{Bernard Day - Chassis Design}
BY.{R.W. Bailey - Chief Engineer} | 5.9.28 | Agreed. BY.{R.W. Bailey - Chief Engineer}
EP.{G. Eric Platford - Chief Quality Engineer} | 11.9.28 | Agreed. EP.{G. Eric Platford - Chief Quality Engineer}
E.{Mr Elliott - Chief Engineer} | 11/9/28 | C Smith Agreed.
PN.{Mr Northey} | 7.9.28 | Agreed. PN.{Mr Northey}
CWB. | 25.9.28 | Agreed. CWB.
HS.{Lord Ernest Hives - Chair} | 5.9.28 | Agreed. Hs.{Lord Ernest Hives - Chair}
  
  