From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Standardisation of a Phantom II starter motor main armature return spring.

Identifier  ExFiles\Box 172\3\  img117
Date  30th November 1929
  
RR 755 REVISED (10H) (DF 657 4-1-29) BM. 2/5943
COMPLETED 19.12.29.
STANDARDISATION of CHASSIS PARTS.
Date 30.11.29
Description of Parts. Phantom II starter motor main armature return spring of higher rating than standard in accordance with figures quoted in our EFC1/AD12.U.29
Origin. To enable disengagement to take place more quickly and so prevent rapid subsequent spinning of motor armature.
Experimental Test Report. See EFC1/AD12.10.29.
Road Test Report.
This spring has been the subject of thorough bench tests and has done 4,500 miles on exptl. Chassis 20-EX with satisfaction in both cases. Gear scream on disengagement is reduced by its use.
Weight of Old Part. £
Weight of New Part. £
Difference per Car. £ negligible.
Signature from Cost Dept. that above is correct G/Rb{R. Bowen}13.12.29. G.{Mr Griffiths - Chief Accountant / Mr Gnapp} Wor.{Arthur Wormald - General Works Manager}

X No. 7625
Drawing No.
Part List
A Scrap and replace at all costs, including Chassis already delivered to Customers.
B Scrap and replace on Chassis in Works.
C Scrap present stock and replace on all Chassis not yet handed to test.
D Use existing stock Alteration effective on future Chassis.
Cost of Parts in Works which will be scrapped if commenced on:-
Series.....£.....
Series.....£.....
Series.....£.....

INITIAL
DATE
REMARKS
Bd.{Mr Berend} Sg.{Arthur F. Sidgreaves - MD} 18.12.29 Agreed Sg.{Arthur F. Sidgreaves - MD}
R.{Sir Henry Royce} 4/12/29 Agreed R.{Sir Henry Royce}
WOR.{Arthur Wormald - General Works Manager} 4.12.29 Agreed Wor.{Arthur Wormald - General Works Manager}
RG.{Mr Rowledge} 2.12.29 Agreed Rg.{Mr Rowledge}
DA.{Bernard Day - Chassis Design} 4.12.29 Agreed Da.{Bernard Day - Chassis Design}
BY.{R.W. Bailey - Chief Engineer} 2.12.29 Agreed By.{R.W. Bailey - Chief Engineer}
EP.{G. Eric Platford - Chief Quality Engineer} 4.12.29 Agreed EP.{G. Eric Platford - Chief Quality Engineer}
E.{Mr Elliott - Chief Engineer} 4/12/29 Agreed E.{Mr Elliott - Chief Engineer}
PN.{Mr Northey} 5.12.29 Agreed PN.{Mr Northey}
GWB. 3.12.29 Agreed C.
HS.{Lord Ernest Hives - Chair} 30.11.29 Agreed.
  
  