Progress report on the second speed synchromesh gearbox for the 40/50 HP chassis.


Identifier  ExFiles\Box 15\5\  Scan387
Date  5th April 1934
  
X7310
Wor. {Arthur Wormald - General Works Manager} [struck through]
c. Hs. {Lord Ernest Hives - Chair} [struck through] GRY {Shadwell Grylls}
C. E. {Mr Elliott - Chief Engineer} [struck through]
C. ENT [struck through]
BY. {R.W. Bailey - Chief Engineer} 2/G.5.4.34.

SECOND SPEED SYCHROMESH GEARBOX FOR 40/50 HP. CHASSIS.
-------------------------------------------------
With reference to Wor. {Arthur Wormald - General Works Manager} 8/R.29.3.34. detail drawings for the gearbox castings have been issued to the Pattern Shop, and approximately 50% of the details have been completed.

BY. {R.W. Bailey - Chief Engineer} By
  
  
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).


Copyright Sustain 2026, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙