Progress report on the second speed synchromesh gearbox for the 40/50 HP chassis.
| Identifier | ExFiles\Box 15\5\ Scan387 | |
| Date | 5th April 1934 | |
| X7310 Wor. {Arthur Wormald - General Works Manager} [struck through] c. Hs. {Lord Ernest Hives - Chair} [struck through] GRY {Shadwell Grylls} C. E. {Mr Elliott - Chief Engineer} [struck through] C. ENT [struck through] BY. {R.W. Bailey - Chief Engineer} 2/G.5.4.34. SECOND SPEED SYCHROMESH GEARBOX FOR 40/50 HP. CHASSIS. ------------------------------------------------- With reference to Wor. {Arthur Wormald - General Works Manager} 8/R.29.3.34. detail drawings for the gearbox castings have been issued to the Pattern Shop, and approximately 50% of the details have been completed. BY. {R.W. Bailey - Chief Engineer} By | ||
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
