Time requirements for various vehicle components and a statement on production quality.
Identifier | ExFiles\Box 175\2\ img103 | |
Date | 26th March 1941 | |
- 3 - Cont'd.{John DeLooze - Company Secretary} Rm.{William Robotham - Chief Engineer}1/L/26.3.41. 9. The hand brake and operating gear. Three weeks are required. 10. The launching winch sub-frame. Two weeks are required. 11. Lubrication and gear control. About three weeks. This is quite a big undertaking and we could not promise to complete the work in less than two or three months, since we have other commitments. We do feel, however, that if the winch is to be made at all, it should represent the best that can be produced. Yours faithfully, for ROLLS-ROYCE LTD., | ||