Progress report on design work to reduce material and labour costs for the Phantom III chassis.

Identifier  ExFiles\Box 91\1\  scan0440
Date  27th November 1936
  
Handwritten: Les Have M.S. parts got on the bumper yet Om
Handwritten: γ300

Sg.{Arthur F. Sidgreaves - MD} and Ms.
C. By RHC.{R. H. Coverley - Production Engineer} Rm.{William Robotham - Chief Engineer}
E/Lid.{A. J. Lidsey}4/HP.27.11.36.

Phantom III.

Further to E/Lid.{A. J. Lidsey}1/HP.2.11.36, the following is the present position of design work in progress to reduce the material and labour cost of this chassis.

ITEM.
(1) Cheapened side spare wheel carrier. LeC.5314.
(2) Reduced machining of front suspension spindle - N.Sch.4907.
(3) Modified machining of lower half crankcase - LeC.5313.
(4) Modified design of bottom tappet - LeC.5371.
(5) Simplified wing stay fixing to radiator - LeC.5318.
(6) Wraith type propeller shaft N.Sch.4928.
(7) Ordering small pressings common to all cars in larger quantities.

PRESENT POSITION
Sfy's labour estimate shows reduction of 26%. Instructed experimentally for bumper test - now awaiting results of tests.
Awaiting results of experimental tests - saves 10d per chassis.
Saves approx. 3/- per chassis - tested experimentally successfully - instructed for production 27.11.36.
Final design completed and issued on 10.11.36.
Estimated saving 3/10d (with charges) per chassis instructed experimentally 6.11.36.
Design issued 26.10.36.
Awaiting figures from O.O. on a list of parts submitted for quotations on 2.11.36.
  
  