From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Requesting to expedite the machining of urgently required induction pipes due to poor promised dates for patterns.
Identifier | ExFiles\Box 123\1\ scan0043 | |
Date | 29th March 1940 | |
1036 HPS.{Horace Percy Smith - Experimental Factory Mgr} c. HPS{Horace Percy Smith - Experimental Factory Mgr}/RH.{R. Hollingworth} Rm.{William Robotham - Chief Engineer}6/ML.29.3.40. INDUCTION PIPES. In our list of urgent jobs we ommitted induction pipes. Attached is a list of the pipes which have been instructed and are urgently required. You will note that although the promised dates for the patterns were very poor, in the case of RE 176, 2 months, these should all be finished by now. We shall be very glad if you can expedite the machining of these pieces. Rm.{William Robotham - Chief Engineer} | ||