Rolls-Royce Archives
         « Prev  Box Series  Next »        

Standardisation of a rubber mounting for an engine unit, including cantilever pedals.


Identifier  ExFiles\Box 104\1\  scan0239
Date  7th September 1934
  
AR 755A (SH) (57394. 30-1-34) BM 3/787/1.
COMPLETED 13.11.34.

20/25 STANDARDISATION OF PARTS.

Top right box:
Date: 7.9.34. (30-10-34 is crossed out)
X No. 5005.
Drawing LeC. No. 3909.
Part F60502
List Cant. Pedals F60500
Frames & Figs.

Description of Parts. RUBBER MOUNTING FOR ENGINE UNIT INCLUDING CANTILEVER PEDALS.
Origin. To delete vibrations being transmitted to frame and body.
Report of Experimental Test. Fitted to 21-G-IV, 20-G-IV and GUB-V. {VIENNA} Ran 10,000 miles in France. Vibrations are considerably less noticeable to driver and passengers.

Weight of Old Part.
Weight of New Part.
Difference per Car.

Cost of Old Part. £ 4 - 18 - 7
Cost of New Part. £ 6 - 10 - 8
Difference per Car. £ 1 - 12 - 1 INCREASE
Signature from Cost Dept. that above is correct. GRL 25-10-34

Cost of Parts in Works which will be scrapped if commenced on:-
Series.........£.......
Series.........£.......
Series.........£.......

Approval Table:
INITIAL | DATE | REMARKS
SG. {Arthur F. Sidgreaves - MD} | 8-11-34. | Agreed Sg. {Arthur F. Sidgreaves - MD} (Handwritten signature) J.S NOV (Handwritten)
WOR. {Arthur Wormald - General Works Manager} | 31.10.34. | Agreed Wor. {Arthur Wormald - General Works Manager} (Handwritten signature)
C. | 31.10.34. | Agreed C. (Handwritten signature)
RG. {Mr Rowledge} | |
DA. {Bernard Day - Chassis Design} | 31.10.34. | Agreed Da. {Bernard Day - Chassis Design} (Handwritten signature)
BY. {R.W. Bailey - Chief Engineer} | 30.10.34. | Agreed By. {R.W. Bailey - Chief Engineer} (Handwritten signature)
EP. {G. Eric Platford - Chief Quality Engineer} | 31.10.34. | Have not yet tried car fitted with above in which clutch action can be considered satisfactory. If now O.K. should like to test before agreeing. EP. {G. Eric Platford - Chief Quality Engineer} (Handwritten)
E. {Mr Elliott - Chief Engineer} | 5.11.34. | Agreed AE. (Handwritten signature)
BN. {W.O. Bentley / Mr Barrington} | 1.11.34. | Agreed Bn. {W.O. Bentley / Mr Barrington} (Handwritten signature)
SFT. {Mr Swift} | 30.10.34. | Agreed Sft. {Mr Swift} (Handwritten signature)
MX. {John H Maddocks - Chief Proving Officer} | 3.11.34. | Agreed Mx. {John H Maddocks - Chief Proving Officer} (Handwritten signature)
HS. {Lord Ernest Hives - Chair} | 30.10.34. | Agreed Hs. {Lord Ernest Hives - Chair} (Handwritten signature)

[Circular Stamp: 8 NOV 1934]
[Stamp: Received.]
  
  
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).


Copyright Sustain 2026, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙