Rolls-Royce Archives
         « Prev  Box Series  Next »        

From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Standardisation of a rubber mounting for an engine unit, including cantilever pedals.

Identifier  ExFiles\Box 104\1\  scan0239
Date  7th September 1934
  
AR 755A (SH) (57394. 30-1-34) BM 3/787/1.
COMPLETED 13.11.34.

20/25 STANDARDISATION OF PARTS.

Top right box:
Date: 7.9.34. (30-10-34 is crossed out)
X No. 5005.
Drawing LeC. No. 3909.
Part F60502
List Cant. Pedals F60500
Frames & Figs.

Description of Parts. RUBBER MOUNTING FOR ENGINE UNIT INCLUDING CANTILEVER PEDALS.
Origin. To delete vibrations being transmitted to frame and body.
Report of Experimental Test. Fitted to 21-G-IV, 20-G-IV and GUB-V.{VIENNA} Ran 10,000 miles in France. Vibrations are considerably less noticeable to driver and passengers.

Weight of Old Part.
Weight of New Part.
Difference per Car.

Cost of Old Part. £ 4 - 18 - 7
Cost of New Part. £ 6 - 10 - 8
Difference per Car. £ 1 - 12 - 1 INCREASE
Signature from Cost Dept. that above is correct. GRL 25-10-34

Cost of Parts in Works which will be scrapped if commenced on:-
Series.........£.......
Series.........£.......
Series.........£.......

Approval Table:
INITIAL | DATE | REMARKS
SG.{Arthur F. Sidgreaves - MD} | 8-11-34. | Agreed Sg.{Arthur F. Sidgreaves - MD} (Handwritten signature) J.S NOV (Handwritten)
WOR.{Arthur Wormald - General Works Manager} | 31.10.34. | Agreed Wor.{Arthur Wormald - General Works Manager} (Handwritten signature)
C. | 31.10.34. | Agreed C. (Handwritten signature)
RG.{Mr Rowledge} | |
DA.{Bernard Day - Chassis Design} | 31.10.34. | Agreed Da.{Bernard Day - Chassis Design} (Handwritten signature)
BY.{R.W. Bailey - Chief Engineer} | 30.10.34. | Agreed By.{R.W. Bailey - Chief Engineer} (Handwritten signature)
EP.{G. Eric Platford - Chief Quality Engineer} | 31.10.34. | Have not yet tried car fitted with above in which clutch action can be considered satisfactory. If now O.K. should like to test before agreeing. EP.{G. Eric Platford - Chief Quality Engineer} (Handwritten)
E.{Mr Elliott - Chief Engineer} | 5.11.34. | Agreed AE. (Handwritten signature)
BN.{W.O. Bentley / Mr Barrington} | 1.11.34. | Agreed Bn.{W.O. Bentley / Mr Barrington} (Handwritten signature)
SFT.{Mr Swift} | 30.10.34. | Agreed Sft.{Mr Swift} (Handwritten signature)
MX.{John H Maddocks - Chief Proving Officer} | 3.11.34. | Agreed Mx.{John H Maddocks - Chief Proving Officer} (Handwritten signature)
HS.{Lord Ernest Hives - Chair} | 30.10.34. | Agreed Hs.{Lord Ernest Hives - Chair} (Handwritten signature)

[Circular Stamp: 8 NOV 1934]
[Stamp: Received.]
  
  


Copyright Sustain 2025, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙