The production status of various parts for the 20/25 HP Chassis, L.2. Series.
Identifier | ExFiles\Box 105\1\ scan0230 | |
Date | 6th January 1936 | |
x520 STEADHAN Roy{Sir Henry Royce}/Ms. Hs{Lord Ernest Hives - Chair}/Rm.{William Robotham - Chief Engineer} Sft{Mr Swift}/JMW5/BH.6.1.36. 20/25 HP. Chassis - L.2. Series. With reference to memo' Roy{Sir Henry Royce}/MS10/P.1.1.36, below we give you the position of the items mentioned:- E.56648. Matrix Angle. 200 cut to length. E.56665. Matrix Frame. 200 cut to length. E.57000. Bottom Tank. 44 finished to Op.1. 22 finished to Op.1a. 34 finished. E.57194. Side Frame (R.H) 31 finished to Op.1. 50 finished to Op.4. E.57195. Side Frame (L.H) 34 finished to Op.1. E.56687. Side Bonnet Angle (R.H) 200 cut to length. E.56688. Side Bonnet Angle (L.H) 200 cut to length. E.56695. Tunnel Tube. 200 cut to length. The remainder of the quantities, and the Piece Nos. mentioned have not had any work undertaken on same. Sft{Mr Swift}/JMW. L2 - Mar 2nd 1 chassis. work before. M2 - June 22nd. | ||