Rolls-Royce Archives
         « Prev  Box Series  Next »        

Coachbuilder progress on a body shell and a ventilation system.


Identifier  ExFiles\Box 98\2\  scan0231
Date  26th November 1938
  
-2-

Rm {William Robotham - Chief Engineer} /FD. {Frank Dodd - Bodies} 1./JH.26.11.38.

2.B.50:

The coachbuilder will be ready for the chassis in a weeks time. The body shell is not yet panelled. The time of a week was given by Mr. Ward looking at the body progress 2 weeks would be nearer the figure.

The ventilation made up in the exptl. EX.7.B5 was shown to Mr. Ward, a sketch has been made of the ventilator and a set could be fitted to 10.B.5. if we so desired.

RM {William Robotham - Chief Engineer} /FD. {Frank Dodd - Bodies}
  
  
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).


Copyright Sustain 2026, All Rights Reserved.    whatever is rightly done, however humble, is noble