Development, testing, and standardization process of a 6-volt coil.
| Identifier | ExFiles\Box 31\2\ Scan007 | |
| Date | 13th January 1915 | |
| X.1413 R.R. 238A (100 T) (S.G. 645, 19-2-20) G. {Mr Griffiths - Chief Accountant / Mr Gnapp} 2618 Wor. {Arthur Wormald - General Works Manager} Wor {Arthur Wormald - General Works Manager} /Mcr5/L13.1.15. 13.1.15. X.562 - RE 6 VOLT COIL X.3647 X.1413. X.3761. X.3762. The position of this experiment is as follows. Mr. Royce first definitely instructed a 6 volt coil to be made on 22/4/13, a copy of which Mr. Ellis had. Mr. Ellis completed the first 6 volt coil and issued a report on same on 22/8/13, a second one being reported on on 19/9/13. To Mr. Royce's instructions a 6 volt coil was fitted to chassis 7 CA on 16/2/14 for a lengthy road test. On 3/4/14 Mr. Royce reported the coil to be a success and instructed us to prepare for standardising same. With this end in view we instructed Mr. Ellis to make 12 coils on 22/4/14 to be put into use on "E" series. On 9/6/14 Mr. Royce again pressed for standard-isation sheets to be got out and Mr. Elliott said he was waiting for the experimental dept. report on completion of 10,000 mile road test. This was issued by Mr. Hives on 27/7/14 in which he recommended the standardisation of the coil. From that date the job was out of the hands of the Expl. Dept. all further coils that Mr. Ellis was making being intended for standard production and not for further test. Mr. Elliott informs us that the standardisation of the 6 volt coil is held up awaiting the results of an insulated switch, as the present wiring system is not satisfactory with a 6 volt coil. This insulated switch Contd. | ||
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
