Delay in parts with ebonite-e insulation and the plan to fit a switch to Mr. Royce's next car, 49-GB.


Identifier  ExFiles\Box 31\2\  Scan008
Date  13th January 1915
  
R.R. 293A (100 T) (S G 849. 12-5-20) G 2818
Contd.
-2-
Wor {Arthur Wormald - General Works Manager} /Mcr5/L13.1.15

(X.1413) was instructed up a considerable time ago but Mr. Matthews states that he is awaiting the return of parts which the Order Office should have despatched in November to be built up with ebonit-e insulation, but they were unable this morning to give me any information re same so I have sent them a copy of our previous instructions and they have promised to look into the matter and report to us.

It is intended that this switch shall be fitted to 49-GB the next car to be sent to Mr. Royce.

Mcr.
  
  
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).


Copyright Sustain 2026, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙