From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Confirming the manufacturing feasibility of connection E.76930 as a hot brass pressing and outlining cost savings.
Identifier | ExFiles\Box 132\3\ scan0099 | |
Date | 27th June 1938 | |
316. To. By & Rm.{William Robotham - Chief Engineer}.....From RHC{R. H. Coverley - Production Engineer}/SB{Mr Bull/Mr Bannister}/GTH.{G. T. Houlistan} RHC{R. H. Coverley - Production Engineer}/SB{Mr Bull/Mr Bannister}/GTH.{G. T. Houlistan}1/MC.27.6.38. [Handwritten note top left] Ph III C/case [Handwritten note center] Hives Power [Struck through] [Handwritten note top right] What part is this Rm{William Robotham - Chief Engineer} RE CONNECTION E.76930 Referring to BY/NS.{Norman Scott}3/G.16.6.38., it has been confirmed that it is quite practicable to manufacture the connection, E.76930, as a hot brass pressing, incorporating the lock plate slots and the large bore, the tabs being .025 beneath the main boss, as requested. It is suggested that these be introduced thus providing a saving of 7d in material and 1/5d in labour, i.e. a total saving of 2/- per chassis. This will involve a Tool and Dye cost of £4. 0. 0d. which will be recovered after 40 chassis. Introduction of this piece can be effected at the 1st chassis in 'E' series without scrap. RHC{R. H. Coverley - Production Engineer}/G.T.Houliston. [Signature] | ||