From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Standardisation of jack pads fitted to the rear axle to reduce difficulty in jacking.
Identifier | ExFiles\Box 48\1\ Scan031 | |
Date | 26th May 1927 | |
RR 755 REVISED (10H) (DE 444 6-10-26) BM. COMPLETED 16.6.27. STANDARDISATION of CHASSIS PARTS. Date 26.5.27 X No. 4124 7350 Drawing No. Part List Description of Parts. JACK PADS FITTED TO REAR AXLE. Origin. To reduce difficulties of obtaining satisfactory jack. Experimental Test Report. At present owing to the difference in height of the front and rear axles there is great difficulty in obtaining a jack which will fulfill all conditions. The 6.75" tyres have made it worse. Road Test Report. Fitted to 12-EX. Apart from reducing the jack difficulty, it is a great advantage to have a definite plate to jack up from. [Action Box] X is marked on B. A Scrap and replace at all costs, including Chassis already delivered to Customers. B Scrap and replace on Chassis in Works. C Scrap present stock and replace on all Chassis not yet handed to test. D Use existing stock Alteration effective on future Chassis. Weight of Old Part. Weight of New Part. Difference per Car. Cost of Old Part. £ . 2. 2. Cost of New Part. £ . 9. 8. Difference per Car. £ . 9. 6d. increase. Signature from Cost Dept. that above is correct. My/Rb. {R. Bowen} 31.5.27 Cost of Parts in Works which will be scrapped if commenced on :- Series.......£....... Series.......£....... Series.......£....... [Approval Table] INITIAL | DATE | REMARKS BJ. | 16.6.27 | agreed FHR. [FHR is crossed out] R. {Sir Henry Royce} | 30.5.27 | Agreed. FHR. WOR. {Arthur Wormald - General Works Manager} | 26.5.27 | Agreed. Wor. {Arthur Wormald - General Works Manager} RG. {Mr Rowledge} | 30.5.27 | Agreed. Rg. {Mr Rowledge} DA. {Bernard Day - Chassis Design} | 1.6.27 | Agreed. Da. {Bernard Day - Chassis Design} Subject to inspection of design when drawing is available. BY. {R.W. Bailey - Chief Engineer} | 27.5.27 | Agreed. BY. {R.W. Bailey - Chief Engineer} EP. {G. Eric Platford - Chief Quality Engineer} | 26.5.27 | Agreed. EP. {G. Eric Platford - Chief Quality Engineer} E. {Mr Elliott - Chief Engineer} | 30.5.27 | Agreed. E. {Mr Elliott - Chief Engineer} PN. {Mr Northey} | | CWB. | 27.5.27 | Agreed. CWB. Hs. {Lord Ernest Hives - Chair} | 26.5.27 | Agreed. Hs. {Lord Ernest Hives - Chair} | ||