From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Specification sheet detailing chassis and powertrain components including the propeller shaft, rear axle, and frame fittings.
Identifier | ExFiles\Box 153\3\ scan0135 | |
Date | 7th February 1940 | |
SPECIFICATION SPECIFICATION Nº PL.532 ISSUE Nº 3 SHEET Nº 6 SEC. Nº | TITLE. | DESCRIPTION. | DESIGN Nº | DETAILS | L.O.P. | REMARKS. --- | --- | --- | --- | --- | --- | --- 6110 | PROPELLOR SHAFT | HARDY SPICER JOINTS 1200. SINGLE PROP. SHAFT. SMALL JOINTS. SLIP JOINT AT GEARBOX END. | | | RG{Mr Rowledge}2728 | NEW DESIGN REQUIRED TO SUIT MORRIS B GEARBOX. 6120 | REAR AXLE | SALISBURY HA001-2 & 001-5 RATIO 4.880 TO 1 | PL.372 | | RG{Mr Rowledge}2222 | RR TO MAKE TUBES & SHAFTS, AND ASSEMBLE 6130 | REAR BRAKES | LOCKHEED BISECTOR. 2 LEADING SHOE | PL.372 | | RG{Mr Rowledge}2352 | 6170 | REAR HUBS. | HUBS INTEGRAL WITH BRAKE DRUM | PL.372 | | RG{Mr Rowledge}2223 | WILL TAKE KELSEY HAYES WHEEL 6181 | HYDRAULIC MASTER CYLINDER | LOCKHEED CYLINDERS 1000 TANDEM IN FRONT OF PEDALS. | PL.445 | | | 7000 | FRAME & FITTINGS | JACK LIFTING BRACKET SIDE CHANNELS .056 CROSS IN FRAME .056 REAR CROSSMEMBER 2ND CROSSMEMBER FRONT GUSSETS CROSS STIFFENERS BODY BRACKETS HIGH FRONT ENGINE MOUNTING REAR SPRING ANCHORAGE & SHACKLE REAR ENGINE MOUNTING REAR BUMP BUFFER FRAME CENTRE GUSSET RIGHT HAND FRAME CENTRE GUSSET LEFT HAND HANDHOLES IN FRAME, REAR BUMPER & MOUNTING FRONT CROSSMEMBER | PL.686 PL.393 PL.416 PL.424 PL.425 PL.441 PL.500/1 " PL.534 PL.375 PL.658 PL.419 PL.521 PL.526 PL.538 PL.542 | ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ | RF2259 | FRAME MAKERS DESIGN REQD 7001 | WINGSTAYS | | | | | COACHWORK SECTION R.R. 888 (2H) 16168. 7. 2. 40 N&G.{Mr Griffiths - Chief Accountant / Mr Gnapp} LTD. | ||