The failure of rivets on the servo balance lever for the 25/30 HP & Bentley Servo, recommending an immediate change to bolts.

Identifier  ExFiles\Box 87\5\  scan0063
Date  10th September 1936
  
To By.{R.W. Bailey - Chief Engineer}
c. to E.{Mr Elliott - Chief Engineer}
c. to Da.{Bernard Day - Chassis Design}
c. to Hdy.{William Hardy}
c. to MX.{John H Maddocks - Chief Proving Officer}

X 24/

Hs{Lord Ernest Hives - Chair}/FJH.{Fred J. Hardy - Chief Dev. Engineer}20/KW.10.9.36.

25/30 HP. & Bentley Servo.

The Test Dept. have recently experienced a case of shearing of the rivets on the servo balance lever, on a 25/30 HP. chassis.

It has already been instructed that these should be replaced in due course by bolts, in E/HDY.{William Hardy}3/HP.3.4.36, but as a failure of these parts has now occurred during normal use, we consider that the change should be made immediately, as the failure results in the loss of all servo braking.