From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Instructions for timing the 'Goshawk' engine, referencing drawing LeC.1124.
Identifier | ExFiles\Box 43\1\ Scan001 | |
Date | 26th February 1920 | |
R.R. 235 a (100 T) S.Y. 846 6-S-D: G.{Mr Griffiths - Chief Accountant / Mr Gnapp} 2460 X.3942 To Da.{Bernard Day - Chassis Design} from R.{Sir Henry Royce} Copy to CJ. " " Bn.{W.O. Bentley / Mr Barrington} " " Hs.{Lord Ernest Hives - Chair} " " Ck.{Mr Clark} RB{R. Bowen}/G26.2.20. X.3481. X.3942. RE INSTRUCTIONS FOR TIMING "GOSHAWK" ENGINE. We send you herewith drawing No. LeC.1124 on which the problem of timing the "Goshawk" engine has been rather carefully gone into. You will see from this drawing that it is necessary to cut away the crankshaft pinion flange locally in between the bolts so as to obtain a way through for viewing the meshing of the crankshaft pinion with the intermediate wheel. A modifications to the camshaft worm drive casing is shewn in connection with the inspection holes, but it is not absolutely necessary, to use these for carrying out the operations stated on LeC.1124. It is hoped that the Experimental Department will work to this drawing when erecting the first engine so that the scheme of operations may be tested and improved upon where possible. R.{Sir Henry Royce} *The matter dealt with on this drawing has not been investigated by Mr. Royce, but he considers that we should send it to you as he think that it will probably be useful. R.{Sir Henry Royce} | ||