Rolls-Royce Archives
         « Prev  Box Series  Next »        

From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Standardisation of hydraulic dampers for the '3.S' model, including loading specifications and production recommendations.

Identifier  ExFiles\Box 16\4\  Scan105
Date  7th August 1929
  
To BY.{R.W. Bailey - Chief Engineer} from Hs{Lord Ernest Hives - Chair}/RM.{William Robotham - Chief Engineer}
c. to Wor.{Arthur Wormald - General Works Manager}
c. to Hm.{Capt. W. Hallam - Head Repairs}

FILING
X7520

Hs{Lord Ernest Hives - Chair}/Rm{William Robotham - Chief Engineer}2/BE7.8.29.

"3.S" HYDRAULIC DAMPERS

Hydraulic Dampers to N.S. 2794/5 and 2817, have been standardised for the "3.S", on every car so far tried and approved by Sales, on Mr. Royce's cars and on the experimental cars' 10,000 miles tests the loading has been:-

FRONT
Upward loading....... 60 lbs.
Downward loading..... 60 lbs.
Five dynamic restrictions

REAR
Upward loading....... 60 lbs.
Downward loading..... 80 lbs.
Five dynamic restrictions

We therefore consider that these loads should be used on production. The dampers have purposely been designed to give the maximum facility for adjustments at depots. We are getting out a depot sheet giving the loading we recommend for exceptional people such as speed enthusiasts on the one hand or invalids on the other.

We think that it is essential a simple adaptor should be provided for the front dampers so that the loads can be checked without removing the dampers from the frame.

continued.
  
  


Copyright Sustain 2025, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙