From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Standardisation proposal for a detachable starting handle and shaft.
Identifier | ExFiles\Box 171\1\ img215 | |
Date | 24th July 1930 | |
RR 785 REVISED (10H) (DG 345 19-7-29) SM. 6/643. COMPLETED 12.9.30. STANDARDISATION OF CHASSIS PARTS Date 24.7.30. Description of Parts: STARTING HANDLE WITH SHAFT LEFT IN POSITION ON THE CAR. Origin: Primarily designed for use on cars with front bumpers, where the present handle cannot be inserted. Experimental Test Report. The crank only of the starting handle is detachable; this is much less cumbersome than the complete handle to stow away in the tool kit. Road Test Report. Giving satisfactory results on 24-EX. now doing 10,000 miles test, and also on 25-EX. X No. 7270. Drawing N. Sch. No. 3118. Part List A Scrap and replace at all costs, including Chassis already delivered to Customers. B Scrap and replace on Chassis in Works. C Scrap present stock and replace on all Chassis not yet handed to test. D Use existing stock Alteration effective on future Chassis. Weight of Old Part. Cost of Old Part. £1. 13s. 10d. Weight of New Part. Cost of New Part. £2. 5s. 3d. Difference per Car. Difference per Car. £- 11s. 5d. Increase Cost of Parts in Works which will be scrapped if commenced on:- Series........£........ Series........£........ Series........£........ Signature from Cost Dept. that above is correct. G/Rb.{R. Bowen}5.9.30. G.9.9.30. INITIAL | DATE | REMARKS BK{A. Birkett - Commercial Manager} Sg.{Arthur F. Sidgreaves - MD} | 10.9.30 | Agreed Sg.{Arthur F. Sidgreaves - MD} R.{Sir Henry Royce} | 14/8/30 | Agreed FMR WOR.{Arthur Wormald - General Works Manager} | 25.7.30 | Agreed Wo.r RG.{Mr Rowledge} | 24.7.30 | Agreed Rg.{Mr Rowledge} DA.{Bernard Day - Chassis Design} | 12.8.30 | Agreed Da.{Bernard Day - Chassis Design} BY.{R.W. Bailey - Chief Engineer} | 7.8.30 | Agreed By.{R.W. Bailey - Chief Engineer} EP.{G. Eric Platford - Chief Quality Engineer} | 4.8.30 | Agreed EP.{G. Eric Platford - Chief Quality Engineer} E.{Mr Elliott - Chief Engineer} | 25.7.30 | Agreed AE. PN.{Mr Northey} | 29.7.30 | Agreed PN.{Mr Northey} CWB. | | Agreed C. HS.{Lord Ernest Hives - Chair} | | Agreed. | ||