Rolls-Royce Archives
         « Prev  Box Series  Next »        

From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Broken silencing system and the dispatch of replacement parts.

Identifier  ExFiles\Box 82\5\  scan0116
Date  11th May 1937
  
Wyman
Will you make sure that what is sent out is what -

HOTEL DE FRANCE.
CHATEAUROUX. Indre.
France.
Rm{William Robotham - Chief Engineer}/GWH{George W. Hancock - Head Chateauroux}/4/JAB. 11th May 1937.

200a

Rm{William Robotham - Chief Engineer}

To. Rm.{William Robotham - Chief Engineer}

3. B. IV.

Silencing System.

The front downpipe has broken away from the primary expansion chamber at the weld. There is also a large piece of metal which appears to be a broken baffle rattling about inside the silencer.

A local garage has made a very unsatisfactory welding job of the break, due to the aluminised finish, and it is doubtful if the repair will hold out very long.

We think it advisable to have a new downpipe and expansion box, which is integral with the second expansion chamber, sent out as soon as possible. Will you please arrange for this to be done.

----------

Rm{William Robotham - Chief Engineer}

Present production parts sent.
Downtake pipe in staybright,
remainder in M/S "Aluminized"
Expansion box collar is in M/S as staybright collar is not yet available

Lou Wyman.

Rm{William Robotham - Chief Engineer}/GWH{George W. Hancock - Head Chateauroux}/HFH.{Hoppy F. Hamilton}

H Hamilton
  
  


Copyright Sustain 2025, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙