Rolls-Royce Archives
         « Prev  Box Series  Next »        

Requesting the conversion of a Condor Hangar for a 50-hour test on an Eagle engine with new induction pipes.


Identifier  ExFiles\Box 43\1\  Scan067
Date  20th January 1925
  
To Hy {Tom Haldenby - Plant Engineer} /Mr. Johnson, from Hs. {Lord Ernest Hives - Chair}
c. to RG. {Mr Rowledge} WOR {Arthur Wormald - General Works Manager} , BY. {R.W. Bailey - Chief Engineer}

X3989

Hs {Lord Ernest Hives - Chair} 7/LG20.1.25.

50 HRS. TEST ON EAGLE(Aero Engine) ENGINE WITH NEW INDUCTION PIPES.

After the usual A.I.D. inspection and dismantling, we propose taking a power curve on the test bench and then to run a 50 hrs. on the Hangar.

At present, we have two Hangars being prepared for Condor(Aero Engine) tests. We assume that it is more important to complete the 50 hrs. on the Eagle(Aero Engine) engine than the tests on the Direct Drive Condor(Aero Engine).

Will Mr. Johnson therefore instruct that the Condor(Aero Engine) Hangar be converted for an Eagle(Aero Engine) engine.

Hs. {Lord Ernest Hives - Chair}
  
  
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).


Copyright Sustain 2026, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙