Rolls-Royce Archives
         « Prev  Box Series  Next »        

From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Analysis of S.U. petrol pump complaints and how they were dealt with.

Identifier  ExFiles\Box 146\2\  scan0162
Date  24th February 1936 guessed
  
-18-

65. S.U. PETROL PUMP TOTAL COMPLAINTS
March quarter C.C. 11
C.P. 15 26
Previous quarter C.C. 22
C.P. 10 32

six months 58 58

66. (a) S.U. PETROL PUMP IRREGULAR IN OPERATION
(b) FAILURE OF PUMP
March quarter C.C. 2 2
Previous quarter C.C. 6 6
Six months 8 8

67. S.U. PETROL PUMP LEAKS
March quarter C.C. 2 2
Previous quarter C.C. 10 10
Six months 12 12

We give below an analysis of S.U. petrol pump complaints and how they were dealt with.
Items 1,2,3 & 4 were in connection with non modified pumps.
No. of
(1) Petrol pumps irregular in operation 1
(2) Failure of pump 1
(3) pump leaks 2
(4) pump noisy 6
(5) pump noisy, modified (G5) type 2
(6) modification job as per D.S. Hd.{Mr Hayward/Mr Huddy} 316 15
-----
27

(a) B. 49.BJ - 21397 Kms.- Fitted modified (G5) pump.
(b) B.102.HK{Col. T. Harker - Sales} - 9380 Kms.- Fitted a modified (G5) pump.

BII8.OR - 23121 Kms.- Fitted a modified (G5) pump.
B.I30.EF- 37006 Kms.- " " " " "
  
  


Copyright Sustain 2025, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙