Rolls-Royce Archives
         « Prev  Box Series  Next »        

Verbal agreement confirming modifications to the Wraith II Rear Dumb Iron.


Identifier  ExFiles\Box 8\10\  10-page037
Date  17th December 1936
  
To S. from HPS. {Horace Percy Smith - Experimental Factory Mgr}
C.
C.
C. Bill.
C.
1064 627
HPS. {Horace Percy Smith - Experimental Factory Mgr} 1/BA.17.12.36.

WRAITH II Rear Dumb Iron Loc. 5149

This confirms the verbal agreement by E. {Mr Elliott - Chief Engineer} to consider modification to the above, as follows:-

(1) It was agreed to consider forging the shackle pin boss to size, thus obviating the necessity of milling the outer edge.

(2) Also, it was decided to look into the question of deleting the Distance Piece on the lateral Frame Bolt, replacing this by a Bolt Boss forged integral with the longitudinal boss at the rear end.

(3) A profile milling operation is rendered necessary by the inclusion of a 1.000" radius around the rear member bore, it was agreed to modify this as shown in sketch.

(4) The question of pegging and brazing the rear member into the dumb iron was discussed.
It was decided that the rear member bore should be countersunk, and made a tight fit on the tube and finally welded at the edges, this is to be tried on the first car.

(5) It was also agreed that the shackles would be considered with a view of introducing the Ph.II type which was a simple piece to machine.

HPS. {Horace Percy Smith - Experimental Factory Mgr}
  
  
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).


Copyright Sustain 2026, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙