Production delays and difficulties with the Wraith II frame.


Identifier  ExFiles\Box 8\10\  10-page036
Date  16th December 1936
  
To E.R. & B.Y.
Copy to Dn. RHC. {R. H. Coverley - Production Engineer}
Rm. {William Robotham - Chief Engineer} HPS. {Horace Percy Smith - Experimental Factory Mgr}
RHC {R. H. Coverley - Production Engineer} /TVT. {T. V. Turner}

10664
627
GRY {Shadwell Grylls}

Wraith II Frame.
-----------------

The Wraith II frame was temporarily held up two or three days ago because of the arrival at Messrs.Rubery Owen's of a bundle of drawings showing the latest drilling.

About a month ago it was agreed between ourselves and the Expl. Dept. that the first frame should come in with no drilling for bolts except those required for the actual frame assembly, but we understand that Messrs. Rubery Owen have drilled about 50% of the holes. There appears to be some confusion about the instruction that the first frame was to come undrilled, and that they would receive from us a revised drilling and hand hole drawing to enable them to drill and complete the second frame.

After consultation with HPS. {Horace Percy Smith - Experimental Factory Mgr} it was agreed that we should ask them to build the first frame up without any more holes than those already drilled, and deliver it here as soon as possible, which was anticipated to be about the week-end.

Only two difficulties have been experienced in the production of the Wraith frame. One is that the section springs open on coming out of the die and is flanged again after welding. This, one would anticipate, is in that the frame does not go through the die and is flanged by means of a pressure plate. The other is in connection with the cross member at the back of the battery box. There is high pressure on the dies at the forward and aft faces of this pressing due to the rather sudden change in direction of the underneath face at each end. They would like a very much larger radius to be inserted in this point. We should be glad if the Production D.O. would make this radius as large as the design will permit, the limit being the position of the battery box support which is attached to the underneath face of the pressing.

EV. {Ivan Evernden - coachwork}
  
  
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).


Copyright Sustain 2026, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙