Status report outlining the design and detailing work required for components of the Bentley III model.

Identifier  ExFiles\Box 97\1\  scan0069
Date  13th October 1937
  
To Rm.{William Robotham - Chief Engineer} from Rm{William Robotham - Chief Engineer}/Les.{Ivan A. Leslie} 200B

13.10.37.

POSITION OF BENTLEY III. 400

F.Section
| Design work required. | Detailing Required. | Up to HPS.{Horace Percy Smith - Experimental Factory Mgr} |
|---|---|---|
| Frame and Fittings. | Wing Stays PCD.18. | Front bumpers. PCD.10. PCD.30. |
| Rear springs & fittings. | Petrol tank. | S.Steering tube N.Sch.5189. |
| Steering Box. | Dash casting. | Front suspension. |
| Pedals. | Side spare wheel carrier. P.D.8. | |

G.Section
| Speedometer Drive. | Servo Drive N.Sch.5200. | Gearbox. |
| | Change gear mechanism PD.27. | Rear Axle. |
| | Rear brake inter-shaft GCD.36. | Rear brakes. |
| | Servo Mechanism GCD.8. | Rear hub. |

continued
  
  