Standardisation of parts for the Phantom III starter motor, detailing modifications to improve engagement and reduce cost.
| Identifier | ExFiles\Box 171\5\ img023 | |
| Date | 5th January 1937 | |
| RR 755 (10H) (49968) 19/10/37 C.E.Co. COMPLETED 1.3.38. PHANTOM III STANDARDISATION OF PARTS Date Issued: 5.1.37. Sheet No.: P.15. Drg. No.: H.76194. No.: N.76195. L.O.P.S.: D.76195. (Frame & Field) Description: Starter Motor. (1) Modification to teazer field. (2) Pinion with longer teeth and 45° approach. Purpose: (1) Improve engagement and reduction in cost of manufacture. (2) Improved engagement. Brief Report and Remarks: A starter motor incorporating modified "teazer" field bench tested: improvement of the teazer torque obtained (Rm {William Robotham - Chief Engineer} /RC. {R. Childs} 8/MH. {M. Huckerby} 9.9.37). A starter motor incorporating both the above modifications tested on a customers car (Tudor Hart) 3,000 engagements showed a definitely improved performance. A similar motor was tried out on another customers car (Sir Francis Peek) with similar results Rm {William Robotham - Chief Engineer} /RC. {R. Childs} 7/MH. {M. Huckerby} 23.12.37. and Mx. {John H Maddocks - Chief Proving Officer} 19/N.30.12.37. We know that in several cases the present standard engagement has failed in customers hands. When recommended for Introduction: As soon as possible Report References: Rm {William Robotham - Chief Engineer} /RC. {R. Childs} 8/MH. {M. Huckerby} 9.9.37., Rm {William Robotham - Chief Engineer} /RC. {R. Childs} 7/MH. {M. Huckerby} 23.12.37., Mx. {John H Maddocks - Chief Proving Officer} 19/N.30.12.37. By: Rm {William Robotham - Chief Engineer} , Da {Bernard Day - Chassis Design} , Mx {John H Maddocks - Chief Proving Officer} Old Parts: Material £0.1.6., Labour £0.2.11., Burden £0.5.0., Total £0.9.5. New Parts: Material £0.1.0., Labour £0.1.5., Burden £0.2.5., Total £0.4.10. Decrease in Cost £ 0.4.7d. GRL 2/38 Cost of Tools £ 16.16.0d. Production Position and Comments: Modified starter pinion with improved engagement reduces factory cost of chassis by 4/7d., and is to be introduced at the 26th chassis in 'J' series. Existing material costing £43.17.0d. is rendered scrap, and additional tool cost of £16.16.0d. is involved. The combined tool and scrap cost of £60.13.0d. will be recovered after producing 265 chassis, due to reduction in factory cost. RHC {R. H. Coverley - Production Engineer} Authorisation to Proceed. Introduce on the 26th Chassis in J Series. Sg. {Arthur F. Sidgreaves - MD} [Signature] Date: 1/3/38 Hs. {Lord Ernest Hives - Chair} [Signature] Date: 1/3/38 | ||
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).