Manufacturing and assembly of a chassis frame, including parts, materials, and drilling procedures.
| Identifier | ExFiles\Box 8\10\ 10-page034 | |
| Date | 27th November 1936 | |
| BY. {R.W. Bailey - Chief Engineer} ROY. {Mr H. Royce - Buyer} RHC. {R. H. Coverley - Production Engineer} C. H. {Arthur M. Hanbury - Head Complaints} C.MB. C.B. TOGG 687 RHC {R. H. Coverley - Production Engineer} /TVT. {T. V. Turner} /I/IB.27.11.36. Referring to memo' Rs. {Sir Henry Royce's Secretary} 16/P.10.11.36. (2) Messrs. Rubery Owen are expected to put all Distance Pieces in the frame before welding. With regard to provision for attaching step irons and body brackets. These are shown bolted to the frame. (3) With regard to pieces, E34997, G52344. & K.103. called for in 3 1/2% Nickel Steel, it is understood from the Order Office that Rubery Owen have steel of this value. (4) Battery Crossmember The trouble which they were having with this Crossmember has now been overcome by the D.O.. and drawings altered accordingly. With regard to the drilling of the first frame delivered by Rubery Owen, this has been discussed with DA. {Bernard Day - Chassis Design} and EV. {Ivan Evernden - coachwork} and they have many reasons why this frame should be delivered undrilled. This has been further discussed with RHC. {R. H. Coverley - Production Engineer} , and placed before him their reasons for leaving it undrilled. He now agrees to accept it in that state, but at the same time made it quite clear that he accepted it only as a purely experimental frame. We could then determine the correct position of all holes required to be drilled by Messrs. Rubery Owen and drawings be prepared and sent on to them. This will enable Messrs. Rubery Owen to deliver the second frame as a complete assembly. RHC {R. H. Coverley - Production Engineer} /TVT. {T. V. Turner} DJS | ||
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
