Rolls-Royce Archives
         « Prev  Box Series  Next »        

From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Design position status report for the Wraith II, listing components and their completion status.

Identifier  ExFiles\Box 161a\4\  scan0104
Date  17th July 1936
  
(4)
WRAITH II - CONTINUED
ITEM. DESIGN POSITION.
Exhaust system - Front silencer. Completed 9.7.36.
" " Tail pipe suspension. " 9.7.36.
" " Rear silencer. " 9.7.36.
" " Rear silencer suspension. Completed.
N/S dash bracket and front footboard. Completed 2.7.36.
Floorboards. Completed 2.7.36.
Pedal gap plate. " 15.7.36.
Dashboard, dashboard insulation and scuttle isolation. " 15.7.36.
Brakes:- Modified front brake drums. " 9.7.36.
" Rear brake intermediate levers. " 17.7.36.
" Front brake actuation and adjusters. " 14.7.36.
" Front brake balance gear. " 14.7.36.
" Arrangement of brake linkage layout. In hand.
Front roll rod, bumper fixings, front crossmember and brake idler. Completed 7.7.36.
Controls:- Side elevation of engine and damper governor controls. Completed 7.7.36.
" Cross section of engine and damper governor controls. " 7.7.36.
" Hand choke controls and modified petroflex connection. " 7.7.36.
Engine pressure oil filter and two stage relief valve. " 2.7.36.
Low pressure oil pipes. " 9.7.36.
  
  


Copyright Sustain 2025, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙