Rolls-Royce Archives
         « Prev  Box Series  Next »        

From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Summary of a second 100-hour contract running test on a 4-stroke diesel engine.

Identifier  ExFiles\Box 133\3\  scan0060
Date  6th March 1939
  
1128

To By.{R.W. Bailey - Chief Engineer} from Rm{William Robotham - Chief Engineer}/Ed.{J. L. Edwards}
c. Da.{Bernard Day - Chassis Design}
c. Da{Bernard Day - Chassis Design}/Jnr.{Charles L. Jenner}

Rm{William Robotham - Chief Engineer}/Ed.{J. L. Edwards}3/MH.{M. Huckerby}6.3.39.

4-STROKE DIESEL ENGINE.

Herewith summary of second 100 hours contract running carried out on the above unit.

Rm{William Robotham - Chief Engineer}/Ed.{J. L. Edwards}
  
  


Copyright Sustain 2025, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙