Rolls-Royce Archives
         « Prev  Box Series  Next »        

From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
List of design considerations and requirements for the petrol supply system and tank.

Identifier  ExFiles\Box 154a\3\  scan0221
Date  27th March 1936 guessed
  
PETROL SUPPLY SYSTEM & TANK.

(1) Petrol must be filtered close to the carburetter.
(2) Pipe lines outside frame and petrol filter in a cool place to avoid vapour lock.
(3) Silence of petrol pump.
(4) Adequate delivery at all speeds.
(5) Effect of various types of fuel on pump diaphragms.
(6) Effect of altitude.
(7) Fumes from over-filling and spilling from the vent.
(8) Tank drumming.
(9) Tank weight. This should not be more than per lb. of petrol carried.
(10) Immunity from puncture by means of a stone guard, or the thickness of material.


Continental work two-thirds, including 50% mountain work.
London traffic one-third.
  
  


Copyright Sustain 2025, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙