Standardisation sheet memo regarding the timing for incorporating modifications on 'D' series jets.
| Identifier | ExFiles\Box 154a\3\ scan0335 | |
| Date | 27th January 1938 | |
| 1310 To [obscured]g. {Mr Griffiths - Chief Accountant / Mr Gnapp} from Rm {William Robotham - Chief Engineer} /Gry. {Shadwell Grylls} Rm {William Robotham - Chief Engineer} /Gry. {Shadwell Grylls} 5/MH. {M. Huckerby} 27.1.38. STANDARDISATION SHEET NO. P.12. With regard to your memo Sg. {Arthur F. Sidgreaves - MD} 13/E.26.1.38. When this sheet was signed by yourself and Hs. {Lord Ernest Hives - Chair} at the Conference, it was not known on what chassis number the modifications could be incorporated, but it was decided that it should be fitted on production as soon as RHC. {R. H. Coverley - Production Engineer} could arrange it. We therefore kept the sheet in the Experimental Dept. until RHC. {R. H. Coverley - Production Engineer} was able to let us know that the altered jets could be brought in at the 1st. in 'D' series, which he did on 24.1.38. Rm {William Robotham - Chief Engineer} /Gry. {Shadwell Grylls} | ||
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
