Rolls-Royce Archives
         « Prev  Box Series  Next »        

List of required improvements for the Peregrine engine ignition system before final testing.


Identifier  ExFiles\Box 163\7\  img203
Date  1st November 1932
  
X6013

To Hs. {Lord Ernest Hives - Chair} from E. {Mr Elliott - Chief Engineer}

c.c. Sg. {Arthur F. Sidgreaves - MD} For. By. {R.W. Bailey - Chief Engineer} RhC. {R. H. Coverley - Production Engineer} By {R.W. Bailey - Chief Engineer} /RD.
Hs {Lord Ernest Hives - Chair} /Wst.

E.6/HP.1.11.32.

re PeregrineExperimental Bentley car never produced / Aero Engine ignition.

We have been going over the PeregrineExperimental Bentley car never produced / Aero Engine ignition system, with a view to clearing up all the proposed improvements that are required so that these can be incorporated in final units for test.

The list of points is as follows:

(1) Modification to the high tension moulding to avoid the effect of water accumulating in the terminal pockets, and on the top of the terminal projections causing misfiring.
We have a scheme in hand with By {R.W. Bailey - Chief Engineer} /RD. for this.

✓(2) Make and break cam form to be made same as Delco.
This has now been instructed by By {R.W. Bailey - Chief Engineer} /RD.

(3) Make and break springs to be of lighter gauge, same as Delco. By {R.W. Bailey - Chief Engineer} /RD. is looking into this.

(4) Rivetting of fibre block on make and break arms coming loose. We believe the make and break spring, being underneath the fibre block is somewhat responsible for this, and we have an alternative scheme in hand in which the spring is attached to the make and break lever by an independent rivet. BY {R.W. Bailey - Chief Engineer} /RD.

(5) Excessive friction of advance and retard movement, and picking up of aluminium faces in contact. We have a scheme in hand for bushing this, as suggested by RMC, at the same time we think it is very likely that the earthing springs exeAero Enginert an excessive pressure. We have arranged with By {R.W. Bailey - Chief Engineer} /RD. to reduce the thickness of the earthing springs from .018" to .012".

(6) We have a scheme in hand for an improved condenser connection with By {R.W. Bailey - Chief Engineer} /RD.

(7) Timing of rotor with cam. Instructions for rectifying this have been issued - By {R.W. Bailey - Chief Engineer} /RD.

(8) Experiments with rotor contact tail deleted, and width
  
  
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).


Copyright Sustain 2026, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙