Standardisation of a friction device for pivots to prevent low-speed steering wobble.
Identifier | ExFiles\Box 106\3\ scan0068 | |
Date | 30th April 1926 | |
X. 5430 COMPLETED 13.5.26. STANDARDISATION of CHASSIS PARTS. Date 30.4.26. X No. 5430 Drawing No. Part List Description of Parts: FRICTION DEVICE FOR PIVOTS. Origin: To prevent low speed wobbles. Experimental Test Report. We are receiving a number of complaints of low speed steering wobbles on 20 HP. since we deleted the friction device on the pivots. It is recommended we fit the friction device to one pivot. Road Test Report. Run 5000 miles on 9-G-111. Fitted to two customers cars who complained of wobbles. The scheme is similar to that used on all 20 HP. before front wheel brakes. A Scrap and replace at all costs, including Chassis already delivered to customers. B Scrap and replace on Chassis in works. C Scrap present stock and replace on Chassis not yet handed to test. D Use existing stock Alteration effective on future Chassis. Weight of Old Part. Cost of Old Part. £ 14. 2d. Weight of New Part. Cost of New Part. £ 16. 8d. Difference per Car. £ 2. 6d. increase. Cost of Parts in Works which will be scrapped if commenced on:- Series.........£......... Series.........£......... Series.........£......... Signature of Mr. De LOOZE that above is correct. My/Ro.{C. C. Rose - Export Manager} 4.5.26. SIGNATURES, DATE, REMARKS MR. JOHNSON MR. B. JOHNSON, 13.5.26, agreed J MR. ROYCE, 3.5.26, Agreed. FHR. MR. WORMALD, 1.5.26, Agreed. Wor.{Arthur Wormald - General Works Manager} MR. ROWLEDGE, 7.5.26, Agreed. Rg.{Mr Rowledge} MR. DAY, 4.5.26, Agreed. Da.{Bernard Day - Chassis Design} MR. BAILEY, 3.5.26, Agreed. BY.{R.W. Bailey - Chief Engineer} MR. PLATFORD, 1.5.26, Agreed. EP.{G. Eric Platford - Chief Quality Engineer} Very urgent. Should be in a position to apply in case complaints. MR. ELLIOTT, 4.5.26, Agreed. E.{Mr Elliott - Chief Engineer} MR. NORTHEY, 13.5.26, Agreed. P.N MR. HIVES, 10.5.26, Agreed. E.Hives. [STAMPED TEXT: 20 H.P. CHASSIS] [STAMPED TEXT: Received 13 MAY 1926] | ||