Instructions for modifications and testing procedures for B.60 and B.80 engine units.

Identifier  ExFiles\Box 155\2\  scan0318
Date  8th May 1939
  
-3-

B.60 NO.1 UNIT - Cont'd.{John DeLooze - Company Secretary}

Whilst the cylinder heads are being changed the Studebaker damper should be removed for fitting to B.80 No.3 unit.

A B.60 type of harmonic damper to be fitted to B.60 No.1 unit.

B.80 NO.2 UNIT.

Whilst waiting for the induction system, carry out unit deflection tests for Rm{William Robotham - Chief Engineer}/Gry.{Shadwell Grylls}

When running, carry out investigation of crank and cam oscillations as per previous programme.

This should also include the Buick damper SCD.1275.

No. 2 TEST HOUSE.

Unit being assembled for comparison of Hepworth & Grandage "high point pressure" rings with standard.

Sequence should be as follows with each type:-

Immediately after running in carry out power curve and record the "Blow-By" at each speed.

Run 2 hr. oil consumption runs at 4000 R.P.M., until a constant figure is reached after which repeat "blow-by" figures at each power curve speed.

Rm{William Robotham - Chief Engineer}/Swdl.{Len H. Swindell}
[Signature: Swdl{Len H. Swindell}]
  
  