Rolls-Royce Archives
         « Prev  Box Series  Next »        

From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Meeting minutes discussing chassis production, material orders, and development updates for various models.

Identifier  ExFiles\Box 30\2\  Scan018
Date  15th March 1932
  
CHASSIS. Present - Sg.{Arthur F. Sidgreaves - MD} Wor.{Arthur Wormald - General Works Manager} E.{Mr Elliott - Chief Engineer} BY.{R.W. Bailey - Chief Engineer} Hs.{Lord Ernest Hives - Chair} Hy.{Tom Haldenby - Plant Engineer}

Item 4 on Agenda. Further 20/25 material to follow "U" Series.

Wor.{Arthur Wormald - General Works Manager} said it was now time to order further 20/25 material in order to keep up continuity of output.

Sg.{Arthur F. Sidgreaves - MD} gave sanction to order 100 sets of raw material, but to machine only 50 sets.

Staybrite material for exhaust system must not be ordered.
Hs.{Lord Ernest Hives - Chair} will be doing development work on the exhaust system with a view to reducing costs, and instructions for material for this section will be issued later.

Item 5 on agenda. General position re J.III, Peregrine & Bensport.

Sg.{Arthur F. Sidgreaves - MD} read Hs{Lord Ernest Hives - Chair}' note reference Hs{Lord Ernest Hives - Chair}1/MJ15.3.32 re alterations required to J.III. All the items were gone through and discussed.
E.{Mr Elliott - Chief Engineer} explained the position of each of the items and also reported on the progress of Bensport designs.

Item 6 on agenda. Item 7 of last agenda re 18-G-4.

Hs.{Lord Ernest Hives - Chair} reported that 18-G-4 is now on the road. At the present moment it is at Lucas Works where it is being fitted with a standard Luvax central oiling system for trial. The new exhaust system which has been standardised for 181-T onwards to first 100 chassis of "U" Series increases the cost by £6 net.
Hs.{Lord Ernest Hives - Chair} will work on this job with a view to removing this extra cost on chassis after the first 100 in "U" Series by producing a new exhaust system, in which less expensive materials can be used.

contd:
  
  


Copyright Sustain 2025, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙