Rolls-Royce Archives
         « Prev  Box Series  Next »        

From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Testing and necessary modifications for unit construction front shock dampers on a Spectre III rig.

Identifier  ExFiles\Box 95\4\  scan0029
Date  1st July 1935
  
To RHC{R. H. Coverley - Production Engineer}
c.c. to Hs{Lord Ernest Hives - Chair}/W.Bell
+342
HS{Lord Ernest Hives - Chair}/Les.18/KW.1.7.35.

Unit Construction Front Shock Dampers,
N.Sch.4281, as on SpectreCodename for Phantom III III.

We should like the bumper chassis and W.Bell's rig first equipped with the above dampers, as these units can be completely used for testing.

At the moment we have no way whatever for checking the loads of these dampers. For SpectreCodename for Phantom III III an approximate setting was obtained by fitting a very light spring in the suspension. Will you please therefore make a special piston and link, similar to Hs.{Lord Ernest Hives - Chair}1500, so that W. Bell can operate the piston directly with the main lever.

The bumper chassis frame has cracked in the front owing to the weight that is necessary to compress the springs. Will you please try to patch up this failure, and make the necessary fixture so that the same weight can be fixed to the front of the chassis without doing more damage. We do not want to excessively overload the engine mounting.

HS{Lord Ernest Hives - Chair}/Les.{Ivan A. Leslie}
  
  


Copyright Sustain 2025, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙