Production history and material changes of the Phantom magneto high tension wires, specifically concerning the omission of a heat shield.


Identifier  ExFiles\Box 168\1\  img147
Date  23th May 1934
  
Hs. {Lord Ernest Hives - Chair}
-----
BY {R.W. Bailey - Chief Engineer} /Cgh. {W Clough} 6/G. 23.5.34.

RE: PHANTOM MAGNETO HIGH TENSION WIRES.
---------------------------------------

With reference to the attached memo E {Mr Elliott - Chief Engineer} /JNR. {Charles L. Jenner} 2/HP. 18.5.34. we have looked up our records and find that the heat shield was left off production when we introduced the scheme as per LeC.3849 on which the ignition leads to the sparking plugs were re-arranged and the aluminium ignition wire tube with ebonite moulding was replaced with an aluminium tube without covering. Later on, however, the tube was made of mild steel, also without ebonite covering.

If a heat shield is now considered advisable no doubt you will take the matter up with E. {Mr Elliott - Chief Engineer}

BY {R.W. Bailey - Chief Engineer} /Cgh. {W Clough}
  
  
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).


Copyright Sustain 2026, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙