From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Confirming the dispatch schedule for Bentley oil pumps and pipes to the Paris Depot.
Identifier | ExFiles\Box 149\2\ scan0147 | |
Date | 27th February 1937 | |
γ 1265. RHC{R. H. Coverley - Production Engineer}/JMW from Rm{William Robotham - Chief Engineer}/Swdl.{Len H. Swindell} Rm{William Robotham - Chief Engineer}/Swdl.{Len H. Swindell}7/M.27.2.37. Bentley Oil Pumps. In confirmation of your memo RHC{R. H. Coverley - Production Engineer}/JMW10/EMG.18.2.37, in which pumps are to be despatched to the Paris Depot, we presume that you also include the special oil pipes which go with these pumps. Will you please arrange for them to be sent complete with pipes at your promised rate. 6 - 3rd March. 8 - 10th " 8 - 17th " 8 - 24th " Rm{William Robotham - Chief Engineer}/Swdl.{Len H. Swindell} | ||